2.5 years they best make a decision soon! That stadium needs a lot of work. Did they really say they wanted it to be 50k? If so then thats a brand new stadium build.No brainer has to be the one close to the cbd and on the water
Hopefully down the track the ground gets serious upgrades
Can’t see how they upgrade that2.5 years they best make a decision soon! That stadium needs a lot of work. Did they really say they wanted it to be 50k? If so then thats a brand new stadium build.
Santos stadium is just scaffolding. At least the water front one has concrete stands to develop. Filling in the corners might add an additional 10k to the current 25k. Though adding proper seating to the stands will probably reduce their capacities. Neither stadium currently has much by way of corporate options by looks of it.
View attachment 104424
Ive never seen a stadium designed as a major roundabout! How do pedestrians get to it?Can’t see how they upgrade that
Knock down those concrete stands and building again is surely the way to go ?
I would prefer they play out of that then do a full rebuild later at larger capacity than waste money on that and it’s still 25k
If the money was available then 50k plus would be awesome
Looks like a good spot for a ground being near major roads
If you zoom in one stand behind the sticks is corporates
Looks like there’s a fence around it with an entry on one sideIve never seen a stadium designed as a major roundabout! How do pedestrians get to it?