And make greyhound racing a demonstration sport at the OlympicsIf they rebuild the Gabba, they need to bring back the dog track
Re: Gabba. Only when the ball is traveling at speed. Otherwise easy to see empty seats.The Gabba implementation is possibly the best when it comes to multi-coloured seats. On TV it can be really difficult to work out if there is a crowd or not.
Townsville Stadium would be better if they didn't do the light grey Vs.
Not sure why more don't do it as it also helps from a maintenance perspective.
Where does it say the capacity will be kept at 30,000?
30k capacity should leave money for a Suncorp rebuild too
Where does it say the capacity will be kept at 30,000?
Ew don’t link me to that website. They just counted that click as 10,000 website engagements.
Turns out the capacity is 36k. That would cost 2.7 billion though which they apparently can’t afford so interesting to see what happens.
Spending close to 3 billion for the same capacity on a white elephant seems nuts epically with Suncorp ageing and in need of a larger capacity
The $2.7B was for a 50k Gabba.
Turns out the capacity is 36k. That would cost 2.7 billion though which they apparently can’t afford so interesting to see what happens.
Spending close to 3 billion for the same capacity on a white elephant seems nuts epically with Suncorp ageing and in need of a larger capacity
Source?My guess is that The Gabba will receive 300m-600m for a really nice refurb. Upgraded corporate facilities, Women’s dressing rooms, Structure upgrades, Wheelchair and safety upgrades. Giving the Gabba a new 30 year life span. I can see the capacity being slightly reduced. Will look great for the track n field events, and will continue to be QLD’s Main Cricket Oval.
Suncorp looks poised to get the Spoils of the Olympic money. A 68k-72k roofed Upgrade is in the box seat. Costing 500m-1B.
Opening n Closing ceremonies will be held at Lang Park. The QLD Government will see more value given the number of Rectangular Sports played at the ground.
That would be amazingMy guess is that The Gabba will receive 300m-600m for a really nice refurb. Upgraded corporate facilities, Women’s dressing rooms, Structure upgrades, Wheelchair and safety upgrades. Giving the Gabba a new 30 year life span. I can see the capacity being slightly reduced. Will look great for the track n field events, and will continue to be QLD’s Main Cricket Oval.
Suncorp looks poised to get the Spoils of the Olympic money. A 68k-72k roofed Upgrade is in the box seat. Costing 500m-1B.
Opening n Closing ceremonies will be held at Lang Park. The QLD Government will see more value given the number of Rectangular Sports played at the ground.
How does one watch Tik Tok videos without downloading the app?That would be amazing
The nrl can only dream of stuff like this
And still getting 1.2 billion of taxpayers money (half the stadium cost) if this gets approved
No ideaHow does one watch Tik Tok videos without downloading the app?