Above photos.
1. Base concourse is complete everywhere except the south west corner. This is now the only access for large construction traffic and may stay that way for some time yet.
2. Eastern side structural steel has now reached the north east corner. Some concrete terracing has now begun to be installed.
3. North stand structural steel has stalled a little, although there is plenty of steel on the ground ready to be erected.
4. West (corporate side) is almost up to roof level, so complete height.
5. West side lower terrace has almost all formwork in place ready to pour concrete.
6. I was surprised how few people were on site today. Cranes were virtually immobile.
7. Roof structure is now extending up the eastern stand.
Some decent progress in the past two weeks though.
The above photos are courtesy of Parravillian from Skyscraper City.
http://www.skyscrapercity.com/showthread.php?t=1901786&page=9